Renovation guidePok Fu Lam

Chi Fu Fa YuenRenovation guide — Layouts · floor plans · renovation budgets · building rules

置富花園 · 1–20 Chi Fu Road, Pok Fu Lam

Work in progress · 439 sq ft two-bed, Block 14

Written by the team working in the neighbourhood. Every budget is priced by our own quote engine on real project scope — not a per-square-foot guess.

I am:

Free site visit and an itemised quote

PLATE 01 · Elevation diagram1978
28F27F28F28F27F28F5F5F5F
27 blocks · 4,328 flats · 48 years
Completed
1978
Phased completion, Aug 1978 – Jun 1981
Building age
48
years
Blocks
27
20 towers (27–28 storeys) + 7 low-rise blocks (5 storeys)
Units
4,328
Saleable area
431–957
sq ft
Address
1–20 Chi Fu Road, Pok Fu Lam
Developer
A Hongkong Land subsidiary
School net
Primary school net 18

01In 30 seconds

Chi Fu Fa Yuen, in short

Chi Fu Fa Yuen on Chi Fu Road, Pok Fu Lam, was completed in phases from 1978 to 1981: 27 blocks and 4,328 flats from 431 to 957 sq ft — one-bed 431–433, two-bed 439, three-bed 588, top-floor three-bed 809/845 and low-rise 957 sq ft. At over 45 years old, a renovation usually means renewing all wiring and plumbing, waterproofing the kitchen and bathroom, and replacing the windows. In October 2026 we quoted and signed a 439 sq ft two-bed in Block 14: interior works about HK$358k, including new windows and scaffolding. Our quote engine prices a comparable full renovation without windows at from about HK$272k.

02Project log

Our work at Chi Fu Fa Yuen

Real estate, real size, real numbers — published with the owners' consent. We never disclose floor or flat numbers.

Work in progress2026-10 · 439 sq ft

439 sq ft two-bed, Block 14

A 1978 two-bed redone from the shell: kitchen and bathroom retiled and waterproofed, full rewire with a new consumer unit, a slatted kitchen slider and lighting channel — and every window replaced in bronze-finish aluminium.

Project log

  1. 2026-10-03

    Site measure and quote

  2. 2026-10

    Contract signed, first payment

  3. Management application, preparing to start

  4. Strip-out → wiring & plumbing → tiling → windows → carpentry & painting → sign-off

03Layouts

Layouts & renovation budgets

Pick your layout. Budgets are computed by the EASE quote engine at October 2026 rates and checked against 60 of our real quotes (median deviation about 1%).

Layout schematic

Schematic · not to scale

Two-bed · 439 sq ft

Two bedrooms, one bathroom (e.g. Flat E) · 439 sq ft

Living / diningKitchenBathHallBedroomBedroomEntry
Redrawn from the unit layout (simplified, not to scale)

Layout notes

  • An L-shaped living-dining room, with the kitchen and bathroom grouped by the entrance and two bedrooms side by side.
  • In our project the kitchen gets a slatted sliding door, the bathroom a sliding door, and a track-light channel opens up the small living room.
Real quoteSigned · 2026-10 · 439 sq ft

Interior works

about HK$358k

+ Built-in furniture about HK$50k

Where the money goes

  • Strip-out7%
  • Painting12%
  • Masonry & tiling26%
  • Electrical9%
  • Plumbing9%
  • Doors & carpentry12%
  • Ceilings & screens4%
  • Windows & external18%
  • Protection & cleaning3%
  • Full strip-out; walls stripped, skimmed and painted (child-safe paint, ceilings included)
  • New floor tiles; kitchen and bathroom retiled, bathroom waterproofed with a walk-in shower
  • About 4 ft of new block wall
  • New single-phase consumer unit plus 30 × 13A sockets
  • Copper hot and cold water pipes to kitchen and bathroom
  • Entrance door, slatted kitchen slider, bathroom slider, two room doors and a 13 ft track-light channel
  • All windows replaced in 50-series aluminium (about 106 sq ft of window), bronze powder-coat, with scaffolding and insurance

The real quote also covers new windows with scaffolding (about HK$63k), a slatted kitchen slider, a lighting channel and child-safe paint — so it sits above the engine's standard estimate, which excludes windows.

Full renovation

Strip-out, painting, floor tiles, rewiring and panel, kitchen & bathroom plumbing, waterproofing, doors, ceilings and screens

HK$271,600

per sq ft HK$619 · 439 sq ft

See every line
  • 清拆工程1 項HK$26,300
  • 油漆工程(剷底重做)1 項HK$42,200
  • 新鋪地磚連牆腳線1 項HK$31,600
  • 新造及安裝單相電制箱1 項HK$6,500
  • 新造及安裝 13A 電掣(單位)30 個HK$24,000
  • 供應及安裝實心木製大門(掩門連門框)1 度HK$7,000
  • 供應及安裝廚房門(木製掩門/趟門連門框)1 度HK$5,500
  • 供應及安裝廁所門(木製掩門/趟門連門框)1 度HK$5,500
  • 供應及安裝房間門(木製掩門/趟門連門框)2 度HK$11,000
  • 供應及安裝鋁質天花連 LED 筒燈 2 支1 項HK$4,000
  • 新造廚房冷熱水來水位銅喉、去水膠喉、鹹水喉1 項HK$14,000
  • 安裝鋅盆龍頭、鋅盆及洗衣機水龍頭1 項HK$2,500
  • 新鋪指定牆身磚及地台磚1 項HK$23,700
  • 新造冷熱水來水位銅喉、去水膠喉、鹹水喉1 項HK$14,000
  • 安裝浴缸/企缸花灑龍頭、洗手盆龍頭及坐廁1 項HK$2,500
  • 新鋪牆身磚及地台磚及防水工程1 項HK$19,800
  • 新造地台牆身防水工程(採用西卡 107)1 項HK$3,000
  • 新做泥水企缸1 項HK$4,500
  • 供應及安裝鋁質天花連 LED 筒燈 2 支1 項HK$4,000
  • 供應及安裝不銹鋼強化玻璃浴屏1 項HK$6,000
  • 裝修期間清除雜物、泥頭及完成後全屋基本清潔1 項HK$6,000
  • 工程期間購買第三者保險1 項HK$4,000
  • 工程期間現場保護1 項HK$4,000
  • TotalHK$271,600
Open this layout in the calculator

+ Kitchen cabinets

Adds E0-board kitchen cabinets with a quartz worktop

HK$297,800

per sq ft HK$678 · 439 sq ft

See every line

On top of "Full renovation"

  • 供應及安裝高櫃(1 米以上高)— E0/ENF 生態板2 呎HK$4,800
  • 供應及安裝地櫃(1 米以下高)— E0/ENF 生態板7 呎HK$8,400
  • 供應及安裝吊櫃(1 米以下高)— E0/ENF 生態板5 呎HK$6,000
  • 供應及安裝石英石枱面(600 D)7 呎HK$7,000
  • TotalHK$297,800
Open this layout in the calculator

+ Built-in joinery

Adds wardrobes, platform / storage beds and living-room cabinets

HK$358,200

per sq ft HK$816 · 439 sq ft

See every line

On top of "+ Kitchen cabinets"

  • 供應及安裝地台床(400mm) — 第 1 間36 平方呎HK$10,800
  • 供應及安裝全高衣櫃(8 尺以下高) — 第 1 間6 呎HK$14,400
  • 供應及安裝油壓/櫃桶床(400mm) — 第 2 間4 呎HK$8,800
  • 供應及安裝全高衣櫃(8 尺以下高) — 第 2 間4 呎HK$9,600
  • 供應及安裝高身櫃(8 尺以下高)4 呎HK$9,600
  • 供應及安裝地櫃(4 尺以下高)6 呎HK$7,200
  • TotalHK$358,200
Open this layout in the calculator

May be extra, depending on the flat

  • New aluminium windows: about HK$300 per sq ft of window, plus scaffolding & insurance (from HK$4,000)
  • External gas pipe: about HK$15,800 in our recent job (scaffolding extra)
  • Top floor with roof: roof waterproofing priced by area
  • Tiles, sanitaryware, taps and light fittings (we can source them)

Reference budget from the EASE quote engine at October 2026 rates — not a formal quote. Final pricing follows a site visit and an itemised quote.

04Data

2026 real quote data

54 full-renovation quotes (June–October 2026, interior works only, furniture excluded). The bar spans the middle half of quotes; the dot is the median.

  • < 350 sq ft

    n = 9

    HK$180,840HK$121,200–HK$266,745

  • 350–450 sq ft

    n = 17

    This estate's typical size

    HK$241,950HK$162,750–HK$272,805

  • 450–550 sq ft

    n = 9

    HK$251,783HK$168,395–HK$297,700

  • 550–700 sq ft

    n = 13

    HK$354,956HK$327,262–HK$411,825

  • 700–1,100 sq ft

    n = 6

    HK$490,425HK$434,450–HK$611,700

05Before you start

What a 48-year-old building needs

48 years old: what to check

  1. 01

    Rewire and replace the consumer unit

    After 20+ years the original wiring and consumer unit rarely suit today's appliance loads. From our quotes: a new single-phase consumer unit is about HK$6,500–7,000; each 13A socket about HK$800–850.

  2. 02

    Replace hot & cold water pipes

    Old pipes sit inside the walls, so the economical moment to renew them in copper is while the walls are open. From our quotes: about HK$14,000 per kitchen or bathroom.

  3. 03

    Mandatory Window Inspection (buildings 10+ years old)

    The Buildings Department serves notices on private buildings aged 10+ (except domestic buildings of 3 storeys or less) every 5 years; owners appoint a Qualified Person to inspect every window, with repairs by a registered contractor. Replacing windows during a renovation avoids a second round of scaffolding.Buildings Department — Mandatory Window Inspection Scheme ↗

  4. 04

    Mandatory Building Inspection (buildings 30+ years old)

    Private buildings aged 30+ (except domestic buildings of 3 storeys or less) must have common parts, external walls and projections inspected by a Registered Inspector every 10 years. If the building is about to repair its façade, window-edge waterproofing and external gas pipes can be coordinated with it.Housing Bureau ICU — MBIS & MWIS ↗

  5. 05

    Redo bathroom waterproofing

    Whenever bathroom tiles are relaid, the floor and wall waterproofing is redone (we use Sika 107) and water-tested before tiling — bathrooms are the most common source of leaks into the flat below.

  6. 06

    From our work at Chi Fu Fa Yuen

    Our project replaces every window: about 106 sq ft of window, with the colour change, scaffolding and insurance coming to about HK$63k — roughly 18% of the interior works, so budget for it before signing.

Before work starts

Statutory rules follow the government sources linked below; estate rules (working hours, deposit, lift protection) follow the management office's latest notice — we confirm them before work starts.

  1. 01

    Management-office application

    Most estates require a renovation application, contractor and worker details and a deposit before work starts; working hours, lift protection and debris-removal times follow the management office's notice. We handle and confirm all of it.

  2. 02

    Noise: no powered tools at night or on holidays

    Under the Noise Control Ordinance, construction work using powered mechanical equipment — renovation included — between 7pm and 7am, or on Sundays and public holidays, needs a Construction Noise Permit. Works are therefore scheduled Monday to Saturday in daytime, and estates often set narrower hours.GovHK — Construction and renovation noise ↗

  3. 03

    Window replacement is a Minor Works item

    Repairing or replacing windows is generally Class III item 3.6 under the Buildings Department's Minor Works Control System: it must be done by a prescribed registered contractor, with documents submitted within 14 days of completion. Our window works follow this route.Buildings Department — Minor works related to windows ↗

  4. 04

    Gas work by registered gas installers only

    Under the Gas Safety Ordinance, gas pipes and appliances may only be installed or altered by a registered gas installer of the right class, employed by a registered gas contractor.EMSD — Gas installation work & registered gas contractors ↗

  5. 05

    Structural walls and beams stay put

    Before opening up a kitchen or moving walls, confirm whether the wall is structural. Structural alterations need Buildings Department approval; only non-structural partitions can be removed. We check this at the site visit.

06Time & money

Timeline & payments

How long it takes (our completed projects)

  • 372 sq ft3 months
  • 430 sq ft2 months
  • 430 sq ft2 months
  • 517 sq ft3 months
  • 650 sq ft3 months
  • 680 sq ft3 months
  • 700 sq ft3 months
  • 790 sq ft4 months
  • 820 sq ft4 months
  • 846 sq ft4 months
  • 850 sq ft4 months
  • 850 sq ft4 months
  • 1,800 sq ft6 months

Pay only after each stage is signed off

  1. 20%Deposit · on signing
  2. 20%Plumbing done · you sign off
  3. 20%Tiling done · you sign off
  4. 20%Furniture approved · you sign off
  5. 10%Furniture delivered · you sign off
  6. 10%Snagging done · you sign off

07Ideas

Design directions

01

A 439 sq ft two-bed: sliders and light

Sliding doors for the kitchen and bathroom free up the swing space of hinged doors, and a track-light channel spreads light evenly so the small living room feels wider.

02

Change the window colour while you're at it

Powder-coating the new frames in bronze suits a timber interior; the colour change is a small extra (about HK$6,200 in our project).

08FAQ

Questions owners ask

How old is Chi Fu Fa Yuen?

Chi Fu Fa Yuen was completed in phases between August 1978 and June 1981, so it is about 45–48 years old in 2026 — within both the Mandatory Building Inspection Scheme (30+ years) and the Mandatory Window Inspection Scheme (10+ years).

What layouts are there?

One-bed 431–433 sq ft, two-bed 439 sq ft, three-bed 588 sq ft (Flats B, C, F, G on floors 1–26), top-floor three-bed 809 or 845 sq ft, and the 957 sq ft low-rise flats (3 bedrooms with en-suite and helper's room). We redrew the 439 sq ft two-bed layout from our project.

What does a full renovation cost here?

Our October 2026 two-bed project: about HK$358k for interior works (including about HK$63k for new windows and scaffolding), plus about HK$50k of built-in furniture. Our quote engine prices a comparable full renovation without windows at from about HK$272k.

Do new windows need scaffolding?

Replacing windows high up normally needs external scaffolding and insurance (from HK$4,000 in our quotes; about HK$25k in this project). It is generally a Class III minor works item: done by a prescribed registered contractor, with documents submitted within 14 days of completion.

How long does it take?

Our completed full renovations of 430–520 sq ft took 2–3 months; with new windows, allow extra time for scaffolding and window fabrication.

Chi Fu Fa Yuen

What would your flat actually cost?

Send us your block and floor plan on WhatsApp for same-day feedback. Free site visit, itemised quote.